During the first 6 days of the rainy season, the volume V (in thousands of cubic meters) of water in a reservoir is modeled by
V(t)=−t3+6t2+24t+120,
where t is measured in days (0≤t≤6).
At what time t is water being added to the reservoir at the greatest instantaneous rate?
a) t≈5.5 days
b) t=2 days
c) t=1 day
d) t=6 days