Problem

Problem

A person pulls a bucket of water from a well of depth hh. If the mass of uniform rope is mm and that of the bucket full of water is MM, then work done by the person is a. (M+m2)gh\left(M + \frac{m}{2}\right)gh b. 12(M+m)gh\frac{1}{2}(M + m)gh c. (M+m)gh(M + m)gh d. (M2+m)gh\left(\frac{M}{2} + m\right)gh

Browse the problem library