A 5kg box is moved from a shelf at height 1m above the floor to a platform at height 4m. The path followed is:
(i) lifted vertically from 1m to 2m,
(ii) carried horizontally for 3m at the 2m level, and
(iii) lifted vertically from 2m to 4m.
For g=9.8ms−2,
(a) find the work done by gravity in each segment, and
(b) hence obtain the total work done by gravity for the complete path.
a. (a) Segment (i)
b. (a) Segment (ii)
c. (a) Segment (iii)
d. (b) Total work