Problem

Problem

A bob is suspended from a crane by a cable of length l=5 ml = 5 \text{ m} . The crane and load are moving at a constant speed v0v_0 . The crane is stopped by a bumper and the bob on the cable swings out an angle of 60∘60^\circ . Find the initial speed v0v_0 . ( g=9.8 m/s2g = 9.8 \text{ m/s}^2 )

Browse the problem library